![ABLE Computrac Vapor Pro Rx Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/able/computrac-vapor-pro-rx/computrac-vapor-pro-rx_installation-and-maintenance-instructions-manual_3415772019.webp)
Page 19
10. TEMPERATURE CALIBRATION
TIP: The temperature calibration and verification take approximately five (5) hours.
Parts Required in addition to the
VAPOR PRO
®
RX
Amt.
AZI Part Number
Description
1
Y990-0142 (110 VAC)
Y990-0165 (220 VAC)
Temperature Calibration Kit with 9 VDC, 100 mA, 3.5
mm male plug, positive tip, DC Adaptor
1
Y990-0098 or
Y990-0120
Graphics or Mini Printer kit with cable (optional)
Install the Temperature Calibration Probe into the
calibration port to the rear of and below the bottle ramp
as shown.
The probe must be inserted all the way in until the handle
touches the case.
Run the cable behind the instrument as shown to the right
to help hold the probe in place.
Plug the probe interface cable into the matching
connector on the Temperature Calibration Interface (TCI)
box. Plug the RS-232 interface cable into the matching connector on the TCI box and the
Balance I/O port on the back of the instrument. Plug the AC adaptor into an appropriate isolated
power outlet.