www.abl.de
12
English
10.
Configuring the wallbox for
SBC
home
• Open the wallbox and connect the "USB-RS485 interface" (adjustment kit) from
ABL
to
the charge controller.
• With the PC application, set the maximum charging current planned in section titled
"6. Before installation".
• Set the unique address to the charge controller according to the connection pattern
selected in section titled "8. Installing the wallbox".
Note: for single-phase charging
with phase rotation
, pair the following charge controllers to
the same phase:
• Address 1 and 4
• Address 2 and 5
• Address 3 and 6
This connection and address pattern must be followed even when fewer than six wallboxes
are used. See the installation diagram for your
SBC
home system in the separate
document.
Note: for single-phase charging
without phase rotation
, maximum two charge points, the
charge controller addresses must be:
• Address 1
• Address 2
11. Installing homeCLU
•
SBC
home
must be installed in a dry environment with stable temperature.
• Mount homeCLU on to a DIN rail.
• Mount power supply on to a DIN rail.
• Disconnect all power by opening the main fuses, before clipping on the AC current
sensors.
Содержание SBC Home
Страница 1: ...SBCHome Installation manual B S ABL...
Страница 2: ...www abl de 2 English 20 pages...