EN - 12
BAL.0140 • 2018-10-15
4 Putting into operation
PP Plus 36D/240D/401D
4.7 Connecting the PP Plus control lead
The control lead is open on the machine side. The customer has to provide the connection of a
suitable plug. If all data are provided, the machine can also be delivered ready-to-connect.
Otherwise choose a compatible plug for your power supply and solder it to the corresponding
leads according to the connection diagram.
1
Version KZ-0 / WZ-0
2
Version KZ-2 / WZ-2
Fig. 6
Connecting the control lead
A
M
B
E
F
D
H
G
I
L
K
C
1
3 2
G
H
M
N
+
_
Torch side
Control lead 7-wired
Machine side
Open
Open
Central plug
Pull
Motor
Trigger
Potentio-
1
2
meter
A
Yellow
H
Purple
B
White
I
White
C
Brown
K
Green
D
Purple
L
Blue
E
Yellow
M
Brown
F
Grey
N
White
G
Brown
Tab. 6
Pin assignments