EN - 10
BAL.0107 • 2019-06-19
6 Putting into operation
ABITIG
®
MT
6.1.1 ABITIG
®
MT 200/300W
1
into the adapter
from the front.
2
Slide tungsten electrode
from the front through the adapter
.
3
Screw electrode holder
containing the tungsten electrode
but
do not tighten.
4
Set the length x using the setting gauge
The length x depends on the welding task.
5
Tighten electrode holder
6
Screw pre-mounted unit
into the torch body
as far as it will go.
7
Screw in gas nozzle
.
1
Setting gauge
2
Electrode holder
3
Adapter
4
Tungsten electrode
5
Guide tube
6
Pre-mounted unit
7
Torch body
8
Gas nozzle
Fig. 1
Equipping the
ABITIG
®
MT
200/300W
x
1
2
3
4
5
6
7
8
Содержание ABITIG MT 200W
Страница 91: ...BAL 0107 2019 06 19 ZH 19 ABITIG MT 记录 记录 ...