INSTALLATION GUIDE
Note: This product must be installed by a licensed tradesperson.
This is a general installation guide - there are many factors that
are involved that can alter the installation method. For installations
within Australia and New Zealand, this product must be installed in
compliance with AS/NZS 3500.
1. Use the base as a template to mark holes.
2. Place lid on top to check level. Double check
your position is correct.
1
1. Tighten nuts to secure base down.
2. Attach hot and cold water pipes (use
appropriate thread sealant).
3
5
Attach and bolt body to base.
6
1. Trim plastic housing to be level with floor
structure (if required).
2. Secure water pipes appropriately.
4
1. Remove base, drill the holes into the
concrete footing to a depth of 60mm.
2. Insert dyna bolts.
CONCRETE FOOTING
2
1.
1.
1.
1.
2.
2.
2.
Hot
Cold
2.
60
Connect shower head to Arm.
Note:
Drainage not shown, please ensure drainage
is compliant with your local standard
Important!
There are many installation options for this product. We recommend consulting
your designer or plumber prior to commencing any works to determine the most
appropriate method for you.
Please note this product must not be installed
encased in concrete to allow access to water connections.
See examples of
correct installation methods below. ABI's warranty is void if this product
is installed incorrectly or encased in concrete.
Installation on top of
concrete slab
with
timber decking
This installation in shown in
the following Install Guide
Installation on top
of concrete slab
with
fine stone fill
,
decorative stone
and
removable
paving
Installation on top
of concrete slab
with
fine stone fill
and
decorative stones
ABI'S WARRANTY IS VOID IF
THIS PRODUCT IS INSTALLED
INCORRECTLY OR ENCASED
IN CONCRETE.
WARNING!