Auxiliary contacts

Auxiliary contacts will be shipped loose. Use Table 1 and Figure 3 to apply A (NO) and B (NC) contacts

 

for correct operation. Each source has two separate mounting points capable of holding up to two aux 
contacts each for position indication, for a total of four per source. There is no restriction  on using 
NO, NC, or both in any location.

Auxiliary contact states

Position

OA1G10

(NO)

OA3G01

(NC)

SOURCE 1 (S1), max 2+2

I
O
II

SOURCE 2 (S2), max 2+2

I
O
II

Table 1

Note: Auxiliary contacts are very difficult to remove once applied! 

Auxiliary contacts installation

2

OA_

Max. 4×2 pcs

SOURCE 1
(S1)

SOURCE 2 
(S2)

1

Figure 3

Содержание Zenith ZTG Series

Страница 1: ...tended to replace document 1SCC303023M0201 ZTG series O M which is called out in some cases for further detail This quick start guide is intended to help the user power the ATS and make it fully operational with a few simple steps This document references the manual frequently for further details ...

Страница 2: ...ctions 9 Place for Ekip modules communication signaling and connectivity modules 10 Auxiliary contact block mounting location 11 The product identification label 12 Programming port only for Ekip Programming module and Ekip Bluetooth modules About your ZTG series ATS Zenith ZTG D series construction 2 8 9 4 6 1 10 12 11 3 5 7 Zenith ZTG D series ATS consists primarily of the TruONE power panel and...

Страница 3: ...t AUTO S1 S2 LOAD l ll Esc With Ekip Programming module and a laptop with Ekip Connect software you can view status set operational parameters and configure generator exercisers on the ATS even without any line voltage or auxiliary power connected to the panel This USB module plugs directly to the HMI Download the Ekip Connect software and manual from the QR code or the web address at the right ht...

Страница 4: ...to two aux contacts each for position indication for a total of four per source There is no restriction on using NO NC or both in any location Auxiliary contact states Position OA1G10 NO OA3G01 NC SOURCE 1 S1 max 2 2 I O II SOURCE 2 S2 max 2 2 I O II Table 1 Note Auxiliary contacts are very difficult to remove once applied Auxiliary contacts installation 2 OA_ Max 4 2 pcs SOURCE 1 S1 SOURCE 2 S2 1...

Страница 5: ... label matches the installed application For location see Figure 1 number 12 3 Confirm that cables are connected properly and torqued according to label the ATS labeling 4 Verify that the enclosure ground connection is properly terminated 5 Confirm that control wiring for engine start is properly terminated to the engine start contact located in Figure 1 number 8 6 Additionally connect all applica...

Страница 6: ...Auto Alarm reset Resets alarms if any If no alarms toggles between Manual and Auto modes 5 I ON Operate switch to I position 6 II ON Operate switch to II position 7 O OFF ZTGD only Operate switch to O position Slide switch Figure 1 number 4 must be in Auto and controller mode Figure 4 number 4 must be in Manual 7 5 6 1 2 3 2 4 l ON ll ON Auto Alarm reset O OFF Esc HMI keypad operation Figure 4 ...

Страница 7: ...system voltage frequency and phase sequence Follow the steps in the figure on the HMI to run auto configure The ATS must have at least one source available to complete this step S1 Connected to Load Load Current 393 A 11 06 60s G Override S1 Fail TruONE ATS System Overview S1 Ok Not Ok S2 Operation Parameters Measurements About Test Settings TruONE ATS Auto Configure Figure 5 ...

Страница 8: ...0 of nominal Voltage and frequency pick up 14 of nominal 19 5 of nominal In phase Monitor Off Off On Manual Retransfer Off Off On Commit Transfer Off Off On Application S1 Transformer S2 Generator See manual Settings can be changed via the HMI as shown in Figure 6 See section 4 of the ZTG D O M for further detail A password is required to change parameters the default password is 00001 Alternative...

Страница 9: ...dard I O or any com modules such as Ekip 2k Signaling I O must be programmed these can be set in the same manner by following the appropriate path below from the main menu Settings Standard I O Settings or Settings Modules Figure 6 ...

Страница 10: ...re door is closed This slide switch overrides the Auto Manual mode set from the HMI To place ATS controller in auto mode press the auto key on the HMI as in Figure 7 If already in Auto mode pressing this key will take the switch out of Auto mode Confirm the ATS is in Auto mode by validating that the AUTO LED above and to the right of the LCD screen is solid green Figure 7 ...

Страница 11: ...n off generator To test ATS generator auto operation while in auto mode simulate a primary source failure by opening the circuit breaker immediately upstream to the ATS s primary source Verify the ATS switches to the backup source according to set point and time delay parameters Reclose the breaker feeding the primary source If the ATS returns to primary source as expected the ATS function in Auto...

Страница 12: ...eo https www youtube com watch v bosvSPVi2sM https www youtube com watch v qV2KoIv38GY Installation of accessories TruONETM ATS Video 1SCC303023K0201 19 10 ABB Zenith Controls Inc 305 Gregson Drive Cary NC 27511 24 hour support ABB Technical Services 1 800 637 1738 epis pqservice abb com http solutions abb zenith User O M manual ZTG ...

Отзывы: