25
PART B Installation, Operation & Maintenance
For driver link setting press composite lever
down (OPEN) using lever and connect the
driver link
between
drive shaft
and
composite lever
as shown in figure.(Drive
link has opposite threads on either ends.
When the drive link is rotated, end pieces on
both ends either gets tightened or loosened
simultaneously).
Caution
: Do not attempt to close the circuit
breaker before drive link setting is over.
View from rear (angle with notch removed for clarity)
Gaskets
Tighten all fasteners of the structure.
Fix pipe assembly for driver link as shown in
figure.
2 nos gaskets, one at top and one at bottom of
pipe assembly are to be used.
Add / remove gaskets to adjust the height of
the pipe assembly.
Insert a drive link through cabinet and pipe.
View from rear (dust & cabinet cover removed)
Composite
Lever (Pole
in half close
position
Driver link
Pipe
Gasket
Drive in
open
position
Содержание VBF Series
Страница 1: ...Outdoor Vacuum Circuit Breaker Type VBF Instruction for Installation Service and Maintenance ...
Страница 51: ...FIG 3 TYPICAL SCHEMATIC DIAGRAM FOR VBF36 51 Drawings ...
Страница 53: ...53 Drawings Fig 4c View from Rear side Covers removed ...
Страница 58: ...58 Dismantling of Operating Coils Setup Disconnect the motor power supply 7 Fig 11 Fig 12 Motor ...