Assembly Instructions / TPR56FV.. - TPR61FV..
4 Installing the turbocharger /
© Copyright 2018 ABB. All rights reserved.
HZTL455311P0033_EN
Revision B
May 2018
4
Installing the turbocharger
u
Remove the cover from the oil connection.
u
Check lifting gear.
u
Attach one lifting gear each to the two fins of the bearing casing provided for this pur-
pose and to the gas inlet casing (
Weight and transportation of the turbocharger
).
NOTICE
Oil orifice
There is an orifice in each of the two oil inlet channels of the bearing casing.
The diameter of this orifice is individually adapted by the enginebuilder for
the purpose of adjusting the oil pressure.
u
Align turbocharger on bracket.
Tightening the foot fixing screws
Fig. 2: Tightening foot fixing screws
Position
TPR56FV..
TPR61FV..
B
135 Nm
205 Nm
Table 5: Tightening torque for foot fixing screw (B)
u
Lightly oil the foot fixing screws (B).
u
Fit foot fixing screws (B) 1 to 4 with sliding block (S). Observe the tightening torque.
u
Fit foot fixing screws (B) 5 to 8. Observe the tightening torque.
u
Fit speed sensor and plug in cable connector (86515).
Page
11
/
17
Содержание TPR FV Series
Страница 2: ......