![ABB Totalflow microFLO G4 Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/abb/totalflow-microflo-g4/totalflow-microflo-g4_startup-manual_3358003.webp)
1
Basic Installation
Step 1
Unpacking and Inspection
The µFLO
G4
and RTD are shipped separately in specially designed
shipping cartons that contain all of the relevant parts needed for
installation. Carefully remove the items from each carton.
Inspect for damage or missing or incorrect parts.
Step 2
Mounting the Unit
There are multiple ways to mount the unit. The following will cover a pipe
mount, wall mount and a direct mount.
2A
Pipe Mount Installation
1) Position the pipe mount on the meter run. The location needs to
be close to the lines and allows for easy access. Temporarily
attach the saddle to the meter run pipe using the associated
hardware.
Содержание Totalflow microFLO G4
Страница 1: ......