Tmax T7-T7M UL
DOC. N.° 1SDH000606R0003 - L3667
1
2
3
Usare cavi o barre isolate/o eseguire prove di
tipo specifiche sull’ installazione.
Use cable or insulated busbars/or perform
specific type test on the installation.
Kabel oder isolierte Sammelschienen
verwenden /oder die spezifische Typprüfung
auf der Installation durchführen.
Utiliser un câble ou des barres isolées/ou
réaliser un test de type spécifique sur
installation.
Utilizar un cable o barras aisladas /o efectuar
una prueba de tipo específico sobre
instalacíon
1÷4
Installation directions
0
2,5Nm
22 lb in
4
F FcCuAI
4x240mm
2
4x500 kcmil
200
200
200
W RC
5÷8
Operating sequences and resetting due to tripping of release
CLACK
OFF
ON
TRIPPED
5
7.87"
7.87"
7.87"
T7-T7M
T7-T7M
T7-T7M
T7-T7M
T7
T7
T7M
Содержание Tmax T7
Страница 4: ...10 9 11 T7 T7 T7 12 T7 IV I In 16 00 A 9 15 Disassembly sequence to install internal accessories T7 ...
Страница 6: ...17 20 T7M T7M W 19 T7M IV W I In 160 0A 18 T7M IV I In 16 00 A ...
Страница 11: ...37 Posizione test Test position Prüfstellung Position de test Posición de prueba 2 STOP 1 CLACK 36 38 OK 35 ...