
39/62
TLE Series 160 to 500 UL S2B
UPS Installation Guide / REV-A
TLE Series 160 - 200 - 225 - 250 - Installation notices in case of power connection with Dual Input Utility
Fig. 4.8.2-3 TLE Series 160 - 200 - 225 - 250 - Interconnection links BR1, BR2 and BR3
For Dual Input Utility, Bypass and Rectifier, the interconnection links BR1, BR2 and BR3 must be
removed (see Fig. 4.8.2-3).
Q1
Q1
I ON
0
OF
F
1
2
36
BR1
(3x20x1mm / L=220mm)
36
37
37
38
38
BR1
BR3
BR2
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST BE REMOVED
E
PO
E
PO
-
+
TLES_UL_1
60-250_S2
b_UPS BR
1-2-3_ABB
_01US
BR2
(3x20x1mm / L=220mm)
BR3
(3x20x1mm / L=220mm)
Содержание TLE Series
Страница 61: ......