5
Installation
5.1
General installation procedure
Preliminary requirements
•
All required permits to
agree with the local rules,
are granted.
•
The AC input cable is
available.
•
The EVSE is unpacked.
•
Tools for installation. Refer
to section
.
•
Installation engineer
•
There is no voltage on
the AC input cable during
the complete installation
procedure.
•
The main switch of the
EVSE is set to "0".
Procedure
1. Prepare the site. Refer to section
.
2. Move the cabinet to the correct location. Refer to section
.
3. Do the electrical installation. Refer to section
4. Prepare for commissioning. Refer to section
.
5.2
Site preparation
5.2.1
Prepare the site
Preliminary requirements
•
Installation engineer
Procedure
1. Make sure that the space and the airflow around the EVSE is sufficient. Refer to
section
2. If the local rules require the installation of an external residual-current device,
install an external residual-current device. Refer to section
.
3. Design the site so that the charge cables can get to the inlet for the charge
cables on the EVs. For the length of the charge cables, refer to section
.
4. Prepare the AC input cable with the required connector. Refer to section
.
5.2.2
Control the space and airflow around the cabinet
Preliminary requirements
•
Installation engineer
Installation
9AKK108467A6997-EN | 003