
12
Exchanging the Fittings Flange with the Blank Flange
View from behind
1
Loosen the 2 fixing screws and open the housing cover.
2
Loosen the 4 fixing screws each on the fittings flange and on the blank
flange.
3
Exchange the fittings flange with the blank flange. Take care not to bend or
squash any hoses.
4
Close the housing cover and secure it with the 2 fixing screws.
The sample gas inlet port can be swiveled by
90°.
Содержание SCC-S
Страница 1: ...SCC S Sample gas feed unit Operator s Manual 42 23 59 EN Rev 1 ...
Страница 35: ...35 Circuit Diagrams SCC S Sample Gas Feed Unit without Peltier Cooler ...
Страница 36: ...36 SCC S Sample Gas Feed Unit with Peltier Cooler ...
Страница 37: ...37 SCC S Sample Gas Feed Unit 24 VDC Power Supply and Solenoid Valves ...
Страница 39: ......