Table of Contents

INTRODUCTION....................................................................................................................................3

GENERAL................................................................................................................................................3

RECEIVING/INSPECTION/STORAGE ..............................................................................................4

PERSONNEL SAFETY ..........................................................................................................................4

VENTILATION .......................................................................................................................................4

EARTHING..............................................................................................................................................4

HANDLING .............................................................................................................................................4

SAFETY NOTES FOR OPERATIONS ................................................................................................5

INSTALLATIONS...................................................................................................................................5

CONNECTIONS......................................................................................................................................5

Tap connections .........................................................................................................................6

Cable Connections .....................................................................................................................6

FINAL INSPECTION PRIOR TO ENERGIZATION ........................................................................6

Electrical Inspection ..................................................................................................................6

Mechanical Inspection...............................................................................................................7

MAINTENANCE AND PERIODIC INSPECTION.............................................................................7

Bolt Tightness.............................................................................................................................7

Inspection and Testing ..............................................................................................................7

Routine Field Testing ................................................................................................................8

1. Insulation Resistance Test ...................................................................................8

2. Connection Test....................................................................................................9

3. Mechanical Operation..........................................................................................9

TRANSFORMER MAINTENANCE.....................................................................................................9

Inspection during operation......................................................................................................9

Maintenance during operation .................................................................................................9

Inspection and Measures to be taken during downtime ........................................................9

Inspection of oil leaks and precautions to be taken..................................................9

Inspection Measurements .........................................................................................................10

Opening/Resealing Sealed type Transformers ........................................................................10

FUSE REPLACEMENT PROCEDURE ...............................................................................................11

LOW VOLTAGE CIRCUIT BREAKER MAINTENANCE ..............................................................11

General .......................................................................................................................................12

Содержание SAHARA Series

Страница 1: ...pment ABB Electrical Industries Co Ltd Kingdom of Saudi Arabia ABB SAHARA Series Compact Substation OPERATING INSTRUCTIONS MODELS 24kV 36kV SAHARA 500 SAHARA MAX 1 SAHARA 1000 SAHARA MAX 2 SAHARA 1600...

Страница 2: ...al Inspection 7 MAINTENANCE AND PERIODIC INSPECTION 7 Bolt Tightness 7 Inspection and Testing 7 Routine Field Testing 8 1 Insulation Resistance Test 8 2 Connection Test 9 3 Mechanical Operation 9 TRAN...

Страница 3: ...tance of care in Site selection and design embodying features that provide adequate ventilation protection and security and which have taken account of appropriate fire moisture and explosion hazards...

Страница 4: ...on has not sustained any damage during transportation Immediately upon receipt of the Package Compact Substation examine them to determine if any damage or loss was sustained during transit If abuse o...

Страница 5: ...LIFT OR MOVE A TRANSFORMER OR PACKAGE COMPACT SUBSTATION WITHOUT ADEQUATE EQUIPMENT AND PRECAUTIONS 2 TERMINALS ARE FOR ELECTRICAL LOADING ONLY 3 DO NOT MAKE ANY CONNECTIONS THAT ARE NOT AUTHORIZED BY...

Страница 6: ...ue stress on the terminals Conductors should be securely fastened in place and adequately supported with allowances for expansion and contraction FINAL INSPECTION PRIOR TO ENERGIZATION After the Packa...

Страница 7: ...wings and previous test records before starting activity Scrutinize maintenance instructions given for the equipment to be maintained Maintenance information is given in the Operation and Maintenance...

Страница 8: ...stigated for possible contamination on the surfaces NOTE For individual circuit protective device s resistance readings load and line conductors should be disconnected If not disconnected the test mea...

Страница 9: ...tenance measures can be carried out which can not normally be performed during operation Before starting maintenance work the transformer has to be disconnected from the network and earthed or grounde...

Страница 10: ...en of milliamperes With the same voltage reading the current taken by other phases can be measured The excitation currents of different phases should be approximately the same magnitude In a damage ph...

Страница 11: ...nergy may be different for different fuse types as well as the selection tables and protection characteristics It is compulsory to use the same type of fuse links in all phases type rated current The...

Страница 12: ...ring periodic checks established the best fixed periods for maintenance work It is also advisable to refer to the following rules The circuit breakers that operate rarely or which remain closed or ope...