![ABB RELION REX640 Скачать руководство пользователя страница 92](http://html.mh-extra.com/html/abb/relion-rex640/relion-rex640_installation-manual_3045255092.webp)
1. Energize the power supply of the protection relay and the optional LHMI. This
can be done in a number of ways, from energizing a whole cubicle to energizing
a single protection relay.
The following sequence is expected when the protection relay is energized:
• The green Ready LED starts flashing instantly on the power supply module of
the protection relay.
• Within 90 seconds both the green Ready LED of the power supply module
and the Home button on the LHMI show a steady light which indicates a
successful start-up.
The start-up time depends on the size of the application
configuration. Application configurations with less functionality have
shorter start-up times.
2. Check the self-supervision function via the HMI path Monitoring > IED status to
verify that the protection relay operates properly.
If the green Ready LED of the power supply module and the
Home button on the LHMI continue to flash after the start-up,
the protection relay has detected an internal error. Navigate to
Monitoring > IED status to investigate the error description.
Checking installation
1MRS759115 E
92
REX640
Installation Manual
Содержание RELION REX640
Страница 1: ... RELION PROTECTION AND CONTROL REX640 Installation Manual ...
Страница 2: ......
Страница 3: ...Document ID 1MRS759115 Issued 2023 02 10 Revision E Copyright 2023 ABB All rights reserved ...
Страница 105: ......
Страница 106: ......
Страница 107: ......