![ABB RELION REC650 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/abb/relion-rec650/relion-rec650_commissioning-manual_2823009.webp)
How to undo forcing changes and return the IED to normal
operation......................................................................................65
Section 9 Testing functionality by secondary injection...................67
Testing disturbance report................................................................67
Introduction..................................................................................67
Disturbance report settings..........................................................67
Disturbance recorder (DR).......................................................... 67
Event recorder (ER) and Event list (EL)...................................... 68
General current and voltage protection CVGAPC.......................69
Built-in overcurrent feature (non-directional).......................... 69
Overcurrent feature with current restraint...............................70
Overcurrent feature with voltage restraint.............................. 70
Overcurrent feature with directionality....................................71
Over/Undervoltage feature..................................................... 72
Completing the test................................................................ 72
Secondary system supervision.........................................................72
Current circuit supervision CCSSPVC.........................................72
Verifying the settings.............................................................. 72
Completing the test................................................................ 73
Fuse failure supervision FUFSPVC.............................................73
Checking that the binary inputs and outputs operate as
expected ................................................................................73
Measuring the operate value for the negative sequence
function ..................................................................................74
Measuring the operate value for the zero-sequence
function ..................................................................................75
Measuring the operate value for the dead line detection
function ..................................................................................76
Completing the test................................................................ 77
Synchrocheck, energizing check, and synchronizing
SESRSYN................................................................................... 77
Testing the synchronizing function......................................... 78
Testing the synchrocheck functionality...................................79
Testing the energizing check..................................................81
Testing the voltage selection..................................................83
Completing the test................................................................ 83
Table of contents
Bay control REC650 2.2 IEC
3
Commissioning manual
Содержание RELION REC650
Страница 1: ...RELION 650 SERIES Bay control REC650 Version 2 2 Commissioning manual ...
Страница 2: ......
Страница 12: ...6 ...
Страница 22: ...16 ...
Страница 26: ...20 ...
Страница 50: ...44 ...
Страница 54: ...48 ...
Страница 110: ...104 ...
Страница 118: ...112 ...
Страница 128: ...122 ...
Страница 129: ...123 ...