When the load current compensation is inactive, the dotted lines and
test point 13 are valid. Test points 5, 6, and 7 are not valid for this
measurement.
X1
X
R (Ohm/phase)
50%
80%
1
2
3
4
5
6
7
8
9
10
11
80% of RLdFw
40% of RLdFw
0.5 x RFPP
12
13
120°
20°
a
c
IEC05000368-3-en
b =
Ar
gLD
IEC05000368 V3 EN
Figure 20:
Distance protection characteristic with test points for phase-to-phase
measurements
is used in conjunction with figure
X1+XN
X
R (Ohm/loop)
50%
80%
1
2
3
4
5
6
7
8
9
10
11
80% of RLdFw
40% of RLdFw
RFPE
12
13
c
b =
Ar
gLD
alt. 80% of
RFPE (Load
encroachment)
120°
20°
a
IEC05000369-3-en.vsd
IEC05000369 V3 EN
Figure 21:
Distance protection characteristic with test points for phase-to-earth
measurements
1MRK 506 355-UEN A
Section 10
Testing functionality by secondary injection
Line distance protection REL670 2.1 IEC
101
Commissioning manual
Содержание Relion 670 Series REL670
Страница 1: ...Relion 670 series Line distance protection REL670 2 1 IEC Commissioning manual ...
Страница 2: ......
Страница 30: ...24 ...
Страница 34: ...28 ...
Страница 64: ...58 ...
Страница 68: ...62 ...
Страница 90: ...84 ...
Страница 254: ...248 ...
Страница 260: ...254 ...
Страница 269: ...263 ...