The following table presents the logical node prefixes for RED500 series IEDs.

Table 5.-1 LN prefixes for RED500

Function Block 
Name

IEC 61850 Logical Node Name

Description

Logical Node Prefix Logical Node Class

Logical Node 

Instance

(Channel Number)

Protection

AR5Func

-

RREC

80

Auto-reclosing function

CUB1Cap

CUB

PTOC

117

Unbalance protection for capacitors

CUB1Cap

CUB

RBRF

117

Circuit breaker failure protection of 
unbalance protection for capacitors

CUB3Cap

CUB

PTOC

52

Three-phase unbalance protection 
for capacitor banks

CUB3Cap

CUB

RBRF

52

Circuit breaker failure protection of 
three-phase unbalance protection 
for capacitor banks

CUB3Low

CUB

PTOC

51

Phase discontinuity protection

CUB3Low

CUB

RBRF

51

Circuit breaker failure protection of 
phase discontinuity protection

DEF2High

DEF

PTOC

41

Directional earth-fault protection 
function, high-set stage

DEF2High

DEF

RBRF

41

Circuit breaker failure protection of 
directional earth-fault protection 
function, high-set stage

DEF2Inst

DEF

PTOC

42

Directional earth-fault protection 
function, instantaneous stage

DEF2Inst

DEF

RBRF

42

Circuit breaker failure protection of 
directional earth-fault protection 
function, instantaneous stage

DEF2Low

DEF

PTOC

40

Directional earth-fault protection 
function, low-set stage

DEF2Low

DEF

RBRF

40

Circuit breaker failure protection of 
directional earth-fault protection 
function, low-set stage

Diff3

HIZ

PDIF

100

High-impedance based differential 
protection for generators and 
motors

Diff3

HIZ

RBRF

100

Circuit breaker failure protection of 
high-impedance based differential 
protection for generators and 
motors

Diff6G

GEN

PDIF

99

Stabilized three-phase differential 
protection for generators

Diff6G

GEN

RBRF

99

Circuit breaker failure protection of 
stabilized three-phase differential 
protection for transformers

DOC6High

DIR

PTOC

36

Three-phase directional 
overcurrent function, high-set stage

DOC6High

DIR

RBRF

36

Circuit breaker failure protection of 
three-phase directional overcurrent 
function, high-set stage

Содержание REF 541

Страница 1: ...Connectivity Packages for REF 541 543 545 REM 543 545 RET 541 543 545 User s Guide...

Страница 2: ......

Страница 3: ...conventions 7 1 6 Terminology 8 1 7 Abbreviations 9 1 8 Related documents 9 1 9 Document revisions 9 2 Installation and uninstallation 11 2 1 Installing connectivity packages 11 2 2 Uninstalling conne...

Страница 4: ......

Страница 5: ...license Copyright 2005 ABB Oy All rights reserved 1 2 Trademarks ABB is a registered trademark of ABB Group All other brand or product names mentioned in this document may be trademarks or registered...

Страница 6: ...nt and usage of connectivity packages This user s guide is divided into following sections Installation and uninstallation This chapter describes the installation and the uninstallation of the connect...

Страница 7: ...rd key that is not labeled on the keyboard For example the space bar comma key and so on Press CTRL C indicates that you must hold down the CTRL key while pressing the C key to copy a selected object...

Страница 8: ...sily with the latest versions of the IED specific information connectivity package Software package that provides device specific information about certain protection and control relay IED which provi...

Страница 9: ...ording to IEC 61850 standard LON A communication protocol developed by Echelon SCL Substation Configuration description Language SPA ABB proprietary communication protocol used in substation automatio...

Страница 10: ......

Страница 11: ...extracts the installation files to your local computer 3 After the connectivity package installation program starts click Next to proceed see Fig 2 1 1 With the Back button you can return to the previ...

Страница 12: ...y Packages User s Guide REF 541 543 545 REM 543 545 RET 541 543 545 A050308 Fig 2 1 1 REF 541 543 545 Connectivity Package installation program 4 Follow the instructions of the installation wizard to...

Страница 13: ...dd or Remove Programs dialog from the Windows Control Panel 2 Select the relevant connectivity package and click Remove see Fig 2 2 1 You can check that you are uninstalling the right connectivity pac...

Страница 14: ......

Страница 15: ...orted applications and tools refer to Section 1 3 General and Section 1 8 Related documents A Connectivity Package Manager window shows the installed applications and tools as well as the installed co...

Страница 16: ...mouse or keyboard s arrow keys You can expand and collaps the nodes by clicking the and icons or pressing left and right arrow keys You can also use the commands from the View menu to expand and colla...

Страница 17: ...ng latest versions to unactive nodes If the connectivity package version has information about supported IEDs this information is shown in the text box under Supported IEDs see Fig 3 2 1 3 With this i...

Страница 18: ...ackage A050314 Fig 3 2 2 2 Adding connectivity package 2 Select a relevant connectivity package installer file msi 3 Click Open The installation program starts to install the selected connectivity pac...

Страница 19: ...e usage of connectivity packages in different products For more information on how to use connectivity packages in applications and tools refer to documentation related to each product Communication G...

Страница 20: ......

Страница 21: ...ee different parts LN prefix LN class and LN instance number LN prefix is an ABB specific string with less than five characters see the table below The LN class is the name of the logical node class d...

Страница 22: ...age DEF2High DEF RBRF 41 Circuit breaker failure protection of directional earth fault protection function high set stage DEF2Inst DEF PTOC 42 Directional earth fault protection function instantaneous...

Страница 23: ...n stage 1 Freq1St2 T1 PTOF 73 Overfrequency protection stage 2 timer 1 Freq1St2 T1 PTUF 73 Underfrequency protection stage 2 timer 1 Freq1St2_1 T2 PTOF 73 Overfrequency protection stage 2 timer 2 Freq...

Страница 24: ...earth fault protection function high set stage NEF1High EF RBRF 39 Circuit breaker failure protection of non directional earth fault protection function high set stage NEF1Inst EF PTOC 90 Non directi...

Страница 25: ...rotection stage 1 NUC3St1 PH RBRF 88 Circuit breaker failure protection of three phase non directional undercurrent protection stage 1 NUC3St2 PH PTUC 89 Three phase non directional undercurrent prote...

Страница 26: ...oltage PSV3St1_1 PS PTOV 112 Positive phase sequence overvoltage PSV3St2 NS PTOV 113 Negative phase sequence overvoltage PSV3St2 PS PTUV 113 Positive phase sequence undervoltage PSV3St2_1 PS PTOV 113...

Страница 27: ...ion low set stage UPOW6St1 PH PDIR 95 Three phase underpower or reverse power stage 1 UPOW6St1 PH PDUP 95 Directional underpower UPOW6St1 PH RBRF 95 Circuit breaker failure of three phase underpower o...

Страница 28: ...eaker failure protection of stabilized restricted earth fault protection low voltage side Diff6T GEN PDIF 106 Stabilized three phase differential protection for transformers Diff6T GEN RBRF 106 Circui...

Страница 29: ...nnector 2 switch control CODC2 DCO XSWI 123 Disconnector 2 disconnector information CODC3 DCO CILO 124 Disconnector 3 interlocking CODC3 DCO CSWI 124 Disconnector 3 switch control CODC3 DCO XSWI 124 D...

Страница 30: ...ensity monitoring of three poles CMSHED CHED GGIO 189 Scheduled maintenance CMSPRC1 SPRC GGIO 190 Spring charging control 1 CMTCS1 TCS GGIO 191 Trip circuit supervision 1 CMTCS2 TCS GGIO 192 Trip circ...

Страница 31: ...P MMXU 207 Three phase power metering MEVO1A U MMXU 205 Voltage measurement A MEVO1B U MMXU 226 Voltage measurement B MEVO3A U MMXU 204 Three phase voltage measurement A MEVO3B U MMXU 206 Three phase...