![ABB PVI-8.0-TL-OUTD Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/abb/pvi-8-0-tl-outd/pvi-8-0-tl-outd_product-manual_3424119066.webp)
- 66 -
000441BG
7 - Operation
• During the grid voltage check and measurement of the insulation re
-
sistance, the values for the grid voltage and frequency and the insula-
tion resistance measured by the inverter are shown on the display. The
inverter completes parallel connection with the grid SOLELY if the grid
parameters meet the ranges provided for by the regulations in force and
if the insulation resistance is greater than 1Mohm.
• If the preliminary checks for parallel connection to the grid are suc
-
cessful, the inverter connects to the grid and begins to export power to
the grid. At this stage, the display shows the inverter’s parameters in
cycles. The green LED stays lit whereas the others are off.
The “Country” value (grid standard) that can be selected are listed in the
following table:
Displayed name Display language
Displayed name Display language
SINGAPORE
English
TAIWAN
English
THAIL. PEA
English
KOREA
English
VDE0126 3W
English
CHINA
English
THAIL. MEA
English
HUNGARY
English
FRANCE 14
French
CORSICA
French
EN50438
English
PORTUGAL
English
CEI 016
Italian
GREECE
English
TURKEY HV
English
NETHERL.
Dutch
SLOVENIA
English
FRANCE 13
French
ROMANIA
English
BDEW
German
TURKEY LV
English
ISRAEL
English
BRAZIL
English
AS 4777
English
C1011 110
French
IRELAND
English
C1011 100
French
UK G59
English
RD 1565
Spanish
UK G83
English
S. AFRICA
English
RD 1699
Spanish
CEI 021 EX.
Italian
ENEL
English
VDE 4105
German
VDE 0126
English
CZECH
Cestina
The list of grid standards given in the table was valid at the time of issue of the manual. It will
be continually updated as new country standards with which the inverter is compatible are
introduced