![ABB PT004042 Скачать руководство пользователя страница 82](http://html.mh-extra.com/html/abb/pt004042/pt004042_operation-manual_2838040082.webp)
Operation Manual / Power2 550-M / High-pressure stage
9 Disassembly and assembly / 9.5 Removing air inlets
© Copyright 2022 ABB. All rights reserved.
HZTL4058_EN
Rev.F
March 2022
9.5
Removing air inlets
u
Mark the casing position for assembly.
Fig. 32: Removing the air inlets
1. Loop the lifting gear around the radial air suction branch (82000).
2. Loosen hexagon-head screws (72013) and remove with washers (72014).
3. Remove the bellows (82300) together with the radial air suction branch (82000) or the
axial air suction branch (82000) with the O-ring (82010), respectively.
u
Measuring radial clearances N and R
).
Page
80
/
119