![ABB PT004042 Скачать руководство пользователя страница 42](http://html.mh-extra.com/html/abb/pt004042/pt004042_operation-manual_2838040042.webp)
Operation Manual / Power2 550-M / High-pressure stage
3 Removal and installation / 3.3 Installing the high-pressure stage
© Copyright 2022 ABB. All rights reserved.
HZTL4058_EN
Rev.F
March 2022
Tightening pressure screws
Fig. 22: Tightening pressure screws
Fixing screw [mm]
Tightening torques [Nm]
M30
43 Nm
Table 11
1. Screw in pressure screws crosswise by hand until reaching the stop.
2. Tighten pressure screws crosswise to 50 % of the tightening torque specified in the
table.
3. Tighten pressure screws crosswise to 100 % of the tightening torque specified in the
table.
4. Work in a circle to tighten all pressure screws to 100 % of the tightening torque specified
in the table.
5. Tighten pressure screws to 100 % in 5 … 7 rounds until the required residual tightening
angle of < 20° is achieved.
Page
40
/
119