Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2017 ABB. All rights reserved.
HZTL4063_EN
Revision A
August 2017
4.10
Installing the cartridge group
Fig. 15: Installing O-rings
u
Fit new O-rings (42017 / 42018).
Fig. 16: Installing the cartridge group 1
1. Clean slots for lamellar rings (64001) and fit new lamellar rings. Arrange joints so that
they are offset by 180°.
2. Fit bracket (90030) and plates (90031) (Bracket assembly
3. Fit lifting gear to swivel lifting eye (90657).
4. Lift cartridge group and carefully move in.
Page
20
/
35
Содержание Power2 850-M16
Страница 28: ......
Страница 32: ......
Страница 42: ......
Страница 44: ......
Страница 70: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 92: ......
Страница 94: ......
Страница 96: ......
Страница 100: ......
Страница 130: ......
Страница 134: ......
Страница 138: ......
Страница 140: ......
Страница 142: ......
Страница 178: ......