Assembly Instructions / Power2 800-M
1
Introduction
Page 3 / 21
© Copyright 2016 ABB. All rights reserved.
HZTL455311P0010
Revision -
March 2016
Design variants
This document is valid for different design variants of low and high-pressure stages. There
may be sections and descriptions of components that are not relevant for a specific low or
high-pressure stage.
ABB Turbocharging Service Stations will be happy to provide information about questions re-
garding a design variant (see "Contact Information" on our website
www.abb.com/turbocharging).
Accuracy of illustrations
The illustrations in this document are general in nature and intended for ease of understand-
ing. Differences in detail are therefore possible.
ABB Turbo Systems
ABB Turbo Systems Ltd is identified as ABB Turbo Systems in this document.
Official service stations of ABB Turbo Systems
Official service stations are identified in this document as ABB Turbocharging Service Sta-
tions. They are regularly audited and certified by ABB Turbo Systems. See "Contact Infor-
mation" on our website at www.abb.com/turbocharging.
Definition of pictograms
The following pictograms can occur in this document. These point out actions that must be
taken in accordance with the meaning of the relevant pictogram.
Pictogram Meaning
Pictogram Meaning
Tighten with specified torque
Oil free, grease free and dry
Tighten over specified tightening
angle
Affix
Hand-tight, tighten without tools
Measure
Oil
Note
Apply screw locking paste (e.g.
Loctite)
Visually inspect
Apply high-temperature grease
See document
Apply other paste in accordance
with specifications
Dispose of in an environmentally
compatible, professional way and
in compliance with locally applica-
ble regulations.
Table 1: Definition of pictograms
Содержание Power2 800-M
Страница 2: ......