3.9 Initial test before commissioning
Protective earth
Before supplying power to the robot and commissioning, verify that the cabinet is
connected to protective earth according to
protective earth to the controller on page 77
Function tests
Before commissioning, perform the function tests in section
to verify that the safety features work properly.
Product manual - OmniCore V250XT
153
3HAC073447-001 Revision: B
© Copyright 2020-2022 ABB. All rights reserved.
3 Installation and commissioning
3.9 Initial test before commissioning
Содержание OmniCore V250XT
Страница 1: ...ROBOTICS Product manual OmniCore V250XT ...
Страница 2: ...Trace back information Workspace 22A version a10 Checked in 2022 03 02 Skribenta version 5 4 005 ...
Страница 34: ...This page is intentionally left blank ...
Страница 50: ...This page is intentionally left blank ...
Страница 174: ...This page is intentionally left blank ...
Страница 410: ...This page is intentionally left blank ...
Страница 418: ...This page is intentionally left blank ...
Страница 454: ......
Страница 455: ......