30
Appendix 1: Quick start-up guide
This quick guide leads the way to install start-up and configure parameters in the normal cases.
1. Preparing installation
Install fiber optic cable inside conduit. This is easier done when temperature is cool and conduit is
straight on the floor. In new devices this cable is installed.
NOTE
DO NOT PULL FIBER OPTIC CABLE STRONGLY. It may break or cut or connector may get
loose.
Connect conduit to sensor head tube.
Install sensor head mounting rack or mounting clamps.
2. Sensor unit installation
Check that dry clean purge air is connected (pressure between 0.5 - 3.0 bar / 7-40 psi).
Check that the eyelet holes are aimed at the web.
Check that the sensor distance from the web is 10
–
30 cm (4 - 12").
Check that the measurement point distance to paper edge is about 30 cm (12").
Fix position preliminary. Tuning may change this slightly.
3. Display unit installation
Check that fiber optic conduit bushing is tight.
Check that fiber optic cable is connected to the
optics block:
Other optic cable to RX.
Another cable to RGB or IR.
Check the wiring of the power supply.
Check the wiring of alarm signal.
Fig. 1.2. Wiring diagram for 110
–
230
VAC
.
Fig. 1.3. Wiring diagram for +24 VDC.
Fig. 1.1. Fiber optic cable connection.
S
h
ie
ld
O
n
O
ff
C
o
m
S
h
ie
ld
O
n
O
ff
C
o
m
FUSE
Break out
Alarm out
KPM Measuring board
F41100031 V1.0
90 - 264 VAC
Содержание KPM KB2
Страница 1: ... KPM KB2 Sheet Break Detector Quick Guide ...
Страница 5: ... KPM KB2 Sheet Break Detector Instruction manual V1 8 ...
Страница 6: ......
Страница 20: ...14 Menu structure Configuration Set up Maintenance Parameters ...
Страница 44: ... ABB Oy KPM Kettukalliontie 9 E 87100 Kajaani Finland 358 10 548 7600 www prokajaani com fi kpm abb com ...