3 Maintenance
3.3.9. Inspection of air hoses (Foundry Prime)
147
3HAC026876-001 Revision: F
© Copyri
ght
200
7-2010 ABB.
All rights reserved.
3.3.9. Inspection of air hoses (Foundry Prime)
General
The air hoses on Foundry Prime robots must be inspected for leakage every six months.
Required equipment
Procedure
For this test it is recommended that the air supply to the robot has a pressure gauge and a cut-
off valve connected.
Equipment, etc.
Art. no.
Leak detection spray
-
Pressure gauge
-
Cut off valve
-
Action
Note
1. Apply compressed air to the air
connector on robot base, and
raise the pressure with the knob
until the correct value is shown on
the pressure gauge.
Recommended pressure:
0.2-0.3 bar
xx0600002794
•
A: Air Connection
•
B: Cut off valve
•
C: Pressure gauge
2. Close the cut off valve.
It should take at least 5 seconds for the pressure to
reach 0 bar.
3. The time is < 5 seconds:
•
If the answer is YES:
Localize the leakage by
following the procedures
below.
•
If the anser is NO: The
system is OK. Remove the
leak testing equipment.
4. Pressurize by opening the cut off
valve.
5. Spray suspected leak areas with
leak detection spray.
Bubbles indicate a leak.
6. When the leak is localized: correct
the leak.
Содержание IRB 6640
Страница 2: ......
Страница 16: ...How to read the product manual 3HAC026876 001 Revision F 14 Copyright 2007 2010 ABB All rights reserved ...
Страница 438: ...4363HAC026876 001 Revision F Copyright 2007 2010 ABB All rights reserved ...
Страница 439: ......
Страница 440: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 3HAC 026876 001 Revision F en ...