2 Installation and commissioning
2.5.5. Securing the base plate
3HAC026876-001 Revision: C
66
© Copyri
ght
200
6-2008 ABB.
All rights reserved.
Base plate, grooves and holes
The illustration below shows the orienting grooves and guide sleeve holes in the base plate.
xx0300000045
Required equipment
A
Guide sleeve holes (2 pcs)
B
Orienting grooves (3 pcs)
C
Levelling bolts, attachment holes (4 pcs)
Equipment
Art. no.
Note
Base plate
3HAC12937-9
Includes
•
guide sleeves, 3HAC12937-3
•
levelling screws, 9ADA120-79
•
attachment screws and
washers for securing the robot
to the base plate.
A drawing of the base plate itself may
be ordered from ABB Robotics!
Standard toolkit
-
The content is defined in section
.
Other tools and procedures may
be required. See references to
these procedures in the step-by-
step instructions below.
These procedures include references
to the tools required.
Continued
Continues on next page
Содержание IRB 6640 - 180/2.55
Страница 2: ......
Страница 14: ...How to read the product manual 3HAC026876 001 Revision C 12 Copyright 2006 2008 ABB All rights reserved ...
Страница 439: ......
Страница 442: ......
Страница 443: ...ABB Robotics S 721 68 VÄSTERÅS SWEDEN Telephone 46 0 21 344000 Telefax 46 0 21 132592 3HAC026876 001 Revision C en ...