3 Maintenance
3.2.2. Maintenance schedule
3HAC027151-001 Revision: B
94
©
Co
py
rig
h
t 200
6-
200
8 ABB. All righ
ts reser
v
ed.
•
3)
Replace when damage is detected or when approaching life limit as specified in
Expected component life on page 95
.
•
9)
"24 000 h" = 6000 h + 18000 h.
•
10)
The lithium battery is used as a memory back-up when the robot system is switched
off. Therefore, the life of a lithium battery depends on how frequently the power to the
system is switched off, and also if the environment temperature is higher than
recommended operating temperature. The life time of the battery pac can also be
extended if the battery shutdown service routine is used during longer production
breaks, described in Operating manual – IRC5 with FlexPendant, chapter battery
shutdown service rutine. The consumption in ordinary shutdowns is then approx. 1
mA. Using sleep mode the consumption is reduced to 0,3 mA. When the battery is
nearly discharged, less then 3 Ah left an alert is given on the FlexPendant and the
battery should be replaced before next longer power switched off period
Activities and intervals, optional equipment
The table below specifies the required maintenance activities and intervals for common
optional equipment. Maintenance of other external equipment for the robot is detailed in
separate documentation.
Changing
Axis 3 gear oil:
Kyodo Yushi TMO
150
First change after: 6
000 h
Second change after:
24 000 h
9)
Do not mix with other oils!
Oil change, gearbox, axis 3
on page 132
Changing
Axis 4 gear oil:
Mobilgear 600
XP320
24 000 h
1)
Oil change, gearbox, axis 4
on page 135
Changing
Axis 5 gear oil :
Mobilgear 600
XP320
24 000 h
1)
Oil change, gearbox, axis 5
on page 137
Changing
Axis 6 gear oil:
Kyodo Yushi TMO
150
First change after: 6
000 h
Second change after:
24 000 h
9)
Do not mix with other oils!
Oil change, gearbox axis 6 on
page 139
Replacement
Robot harness
See note below
3)
Replacement of cable
harness, lower end (axes 1-
2) on page 153
Replacement of cable
harness, upper end on page
159
Replacement
SMB Battery pack When necessary
10)
Replacement of SMB battery
on page 142
Maintenance
activity
Equipment
Interval
Detailed in section
Maintenance
activity
Equipment
Interval
Detailed in section
Inspection
Signal lamp
Inspection, signal lamp on
page 120
Inspection
Mechanical stop axis 1 and 3 12 mths
Continued
Содержание IRB 6620 - 150/2.2
Страница 1: ...Product manual Articulated robot IRB 6620 150 2 2 M2004 ...
Страница 2: ......
Страница 8: ...Table of Contents 6 3HAC027151 001 Revision B Copyright 2006 2008 ABB All rights reserved ...
Страница 14: ...How to read the product manual 3HAC027151 001 Revision B 12 Copyright 2006 2008 ABB All rights reserved ...
Страница 299: ...9 Circuit diagram 9 1 Introduction 3HAC027151 001 Revision B 284 Copyright 2006 2008 ABB All rights reserved ...
Страница 302: ......