
Note
Action
Screw: M3x8 12.9 Lafre
2C2B/FC6.9 (4 pcs)
Refit the base interface panel.
4
Tightening torque: 1.2 Nm
xx2200000074
Reconnecting the SMB connectors
Note
Action
ELECTROSTATIC DISCHARGE (ESD)
The unit is sensitive to ESD. Before handling the
unit read the safety information in section
unit is sensitive to ESD on page 45
1
Tightening torque: 0.4 Nm
Reconnect the connectors.
•
SMB.P7
•
SMB.J1
•
SMB.J2
Tip
See the number markings on the connectors for
help to find the corresponding connector.
2
xx2200000013
Route and secure the cabling with cable straps.
CAUTION
Correct cable routing is highly important.
If the cables are routed and secured incorrectly
the cables can be damaged.
3
Continues on next page
Product manual - IRB 1010
139
3HAC081964-001 Revision: B
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.3.1 Replacing the cable package
Continued
Содержание IRB 1010
Страница 1: ...ROBOTICS Product manual IRB 1010 ...
Страница 2: ...Trace back information Workspace 22D version a9 Checked in 2022 12 16 Skribenta version 5 5 019 ...
Страница 8: ...This page is intentionally left blank ...
Страница 14: ...This page is intentionally left blank ...
Страница 36: ...This page is intentionally left blank ...
Страница 46: ...This page is intentionally left blank ...
Страница 80: ...This page is intentionally left blank ...
Страница 306: ...This page is intentionally left blank ...
Страница 312: ...This page is intentionally left blank ...
Страница 326: ...This page is intentionally left blank ...
Страница 328: ...This page is intentionally left blank ...
Страница 332: ......
Страница 333: ......