![ABB HT613686 Скачать руководство пользователя страница 181](http://html1.mh-extra.com/html/abb/ht613686/ht613686_operation-manual_3952649181.webp)
Operation Manual / A150-M58/68
Figures
© Copyright 2022 ABB. All rights reserved.
HZTL4041_EN
Revision F
February 2022
Fig. 61: Nozzle ring compression PD ...................... 108
Fig. 62: Installing the nozzle ring............................. 109
Fig. 64: Turning the cartridge group ....................... 111
Fig. 65: Installing the cartridge group .................... 112
Fig. 66: Fitting the diffuser ....................................... 113
Fig. 67: Installing the compressor casing............... 114
Fig. 69: Installing the gas outlet flange .................. 116
Fig. 70: Measuring clearances N and R.................... 117
Fig. 71: Fitting the insulation .................................... 118
Fig. 74: Fitting gas outlet casing without support......
120
Fig. 75: Installing gas outlet casing with support 1.....
121
Fig. 76: Installing gas outlet casing with support 2 ....
122
Fig. 77: Installing the air inlets .................................. 123
Fig. 78: Removing the air inlets ................................ 124
Fig. 79: Removing the compressor casing ............. 125
Fig. 80: Pressing off compressor casing ................ 126
Fig. 81: Remove the diffuser...................................... 126
Fig. 82: Removing insulation sheets........................ 127
Fig. 83: Removing cartridge group 1 ....................... 127
Fig. 84: Removing cartridge group 2....................... 128
Fig. 85: Removing cartridge group 3 ....................... 129
Fig. 86: S_05180.......................................................... 130
Fig. 87: Measuring clearance A and B ...................... 131
Fig. 88: Nozzle ring compression PD ....................... 132
Fig. 89: Installing the nozzle ring.............................. 133
Fig. 90: Installing the cartridge group .................... 134
Fig. 91: Installing the cartridge group 2.................. 135
Fig. 92: Fitting the diffuser........................................ 136
Fig. 93: Installing the compressor casing ................ 137
Fig. 94: Measuring clearances N and R.................... 138
Fig. 95: Fitting the insulation .................................... 139
Fig. 96: Installing the air inlets.................................. 140
Fig. 97: Customer tool ................................................. 141
Fig. 98: Positioning the collection tub .................... 142
Fig. 99: Removing the fastening strips ................... 142
Fig. 100: Fitting the upper fastening strips ........... 143
Fig. 101: Fitting the bottom fastening strip........... 143
Fig. 102: Fitting the bottom fastening strip .......... 144
Fig. 103: Initial situation ............................................. 145
Fig. 104: Disassembly of the elbows........................ 145
Fig. 105: Disassembly of the elbows........................ 146
Fig. 106: Pipe disassembly......................................... 146
Fig. 107: Disassembly of the connecting pieces.... 147
Fig. 108: Disassembly of the cleaning nozzle......... 147
Fig. 109: Assembly of the cleaning nozzle .............. 148
Fig. 110: Assembly of the connecting pieces ......... 148
Fig. 111: Pipe assembly................................................ 149
Fig. 112: Elbow 1 assembly ......................................... 149
Fig. 113: Elbow 2 assembly ......................................... 150
Fig. 114: Fit the cleaning nozzles ............................... 151
Fig. 115: Fitting the cover plate................................. 154
Fig. 116: Cover plate drawing .................................... 155
Fig. 117: Dimensions for cover plate ........................ 156
Fig. 118: Special tool.................................................... 176
Page
179
/
181
Page
179
/
181