Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
5 Maintenance / 5.4 Cleaning turbine blades and nozzle ring in opera-
tion
© Copyright 2020 . All rights reserved.
HZTL2498_EN
Rev.F
December 2020
5.4.1
Wet cleaning turbine and nozzle ring during
operation
Prerequisites for wet cleaning of turbine
The following operating state and prerequisites have been tested and
approved by ABB Turbocharging for the cleaning process:
u
The engine has just been started or the engine load has been reduced
as far as possible (best cleaning is achieved at a load level of roughly
10 … 15%).
u
As soon as the turbine inlet temperature is stable and below 430 °C,
wait at least another 10 minutes for the charger parts to cool down.
u
Start cleaning cycle according to following description Wet cleaning
procedure.