Inspection work
3.2
Inspection work includes preventive visual controls plus monitoring and
measuring work before and during commissioning. Inspections help detect
changes to the turbocharger. Machine damage can be avoided.
Inspection before commissioning
Check for correct functioning.
Inspect for damage.
Check oil filter for cleanliness before commissioning.
CAUTION
It is urgently recommended that the entire lubricating system be flushed
thoroughly with warm oil using a bypass pipe before starting up the first
time (commissioning) and after all service work on the lubricating sys-
tem.
It is urgently recommended that a running-in filter is used when running
in the engine and after all service work on the lubricating system.
Check the oil pressure in the oil supply lines.
Check that variable turbine geometry module can be adjusted.
TPL65: Version with compressor wheel cooling system
Check whether compressor wheel cooling system is fitted to bearing
casing.
CAUTION
Failure of compressor wheel cooling system
The service life of the compressor wheel will be impaired if the break-
down of the compressor wheel cooling system lasts long.
Ensure supply of cooling air.
3.2
3.2.1
Monitoring equipment
Air filter mat
Lubricating system
TPL..VA