Mounting Hardware
Hardware for making all cabled connections is included with the BDFB. 3/8 inch hardware for Input
Load Bus connections is installed on the Load Shunt and Load Return Bus Details as shown in
section 9. CC408576210 ¼ inch conical nuts are provided for all output load and return connections.
These nuts are located in the hardware box as shown below.
Floor Mounting
When installing the BDFB cabinet to the floor, the following mounting hardware may be required
depending on customer requirements.
•
Drill anchor holes to depth specified in table below.
•
Place floor insulation pad and/or use insulation bushings provided with anchors if required.
•
Shim under cabinet corners as necessary to level.
•
Torque anchors as specified in table below.
Seismic Zone
Size
2”
deep
Table 3 Isolation and Leveling Kits
Ordering Code
Description
Содержание H569-445
Страница 6: ...Page 6 Copyright 2021 ABB All rights reserved ...
Страница 13: ...Page 13 Copyright 2021 ABB All rights reserved Figure 6 Distribution Connections G7 and G8 ...
Страница 22: ...Page 22 Copyright 2021 ABB All rights reserved ...
Страница 27: ...Page 27 Copyright 2021 ABB All rights reserved Figure 21 Top Feed to Bottom Feed Cabinet Conversion G7 and G8 ...
Страница 32: ...Page 32 Copyright 2021 ABB All rights reserved Figure 25 Customer Interface Board ...
Страница 34: ...Page 34 Copyright 2021 ABB All rights reserved ...
Страница 39: ...Page 39 Copyright 2021 ABB All rights reserved Wiring Schematics Figure 27 Panel Wiring Schematic G7 and G8 ...
Страница 40: ...Page 40 Copyright 2021 ABB All rights reserved Figure 28 Panel Wiring Schematic G101 and G102 ...
Страница 44: ...Page 44 Copyright 2021 ABB All rights reserved ...