Note
Action
xx2000002713
Reconnect the cable lug (pos. 1).
Tighten the screw (pos. 2) according to
Bolt, screws, tightening torques on
page 118
23
xx2200000295
Reassemble the cooling pad (pos. 1) and
leaf shunt (pos. 2) using the pressure
washer (pos. 3) and screws (pos. 4).
Use standard tightening torque according
to
Bolt, screws, tightening torques on
24
xx2200000296
Reconnect the two water hoses distribut-
ing water to the arm.
25
Continues on next page
108
Product manual - GWT C9
3HAA010198-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.8 Replacement of the welding gun arm
Continued
Содержание GWT C9
Страница 1: ...ROBOTICS Product manual GWT C9 ...
Страница 62: ...This page is intentionally left blank ...
Страница 124: ...This page is intentionally left blank ...
Страница 126: ......
Страница 127: ......