Installation and maintenance guide
1ZSC000563-AAX EN, REV. A, 2019-03-21
49
7 Re-packing
7.1 Re-packing of the bushing
Overview
G004181
Procedure
1.
Install the transport container (1):
1.
Replace the drying agent in the transport
container (1).
2.
Install the gasket (2).
3.
Carefully put the transport container on the
bushing, and install the bolts.
CAUTION!
Make sure that the transport container
does not cause damage to the
condenser core.
NOTE!
The transport container has to be
ordered separately.
G004199
Torque
50 Nm
2.
Lift the bushing. Refer to
Lifting the bushing out of the transport box,
page
Содержание GSC Series
Страница 1: ...1ZSC000563 AAX EN REV A 2019 03 21 Transformer bushing type GSC Installation and maintenance guide ...
Страница 40: ...40 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Страница 46: ...46 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Страница 48: ...48 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...
Страница 52: ...52 Installation and maintenance guide 1ZSC000563 AAX EN REV A 2019 03 21 ...