![ABB GPS4827 Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/abb/gps4827/gps4827_user-manual_2838205049.webp)
Page 49
© Copyright 2021 ABB. All rights reserved.
The controller is capable of sequencing rectifiers on line after detecting a AC is being provided by
emergency generator. Internal Rectifier Sequencing requires external wiring to ETR/ETRR on BSL pin
numbers 75/76, and optionally RO/ROR on BSL pin numbers 77/78, in order to function.
The controller can also accept ground signals onto TR1 to TR4 on BSL 73/79/ 85/80 from an external
device to control the sequencing of plant rectifiers in groups as follows:
Additional information on the Rectifier Sequence Options can be found in the User
’
s Guide for
Millennium II Controller Advanced Features manual.
Battery Temperature Option
Slope Thermal Compensation and Battery Reserve Time Prediction features of the controller, require
that battery temperature be monitored. If either of these features is to be configured in Galaxy
software, a battery temperature input must be connected to P3 temperature probe connector on the
Controller board.
Three optional cables are used to connect to various battery arrangements:
Refer to User
’
s Guide for Millennium II Controller Advanced Features manual for additional information
on these features.
Alarm Battery Supply Signals
TR Signal
Rectifiers Affected
TR1
G01, G02, G09, G10, G17, G18, G25, G26, G33, G34, G41, G42, G49, G50, G57, G58
TR2
G03, G04, G11, G12, G19, G20, G27, G28, G35, G36, G43, G44, G51, G52, G59, G60
TR3
G05, G06, G13, G14, G21, G22, G29, G30, G37, G38, G45, G46, G53, G54, G61, G62
TR4
G07, G08, G15, G16, G23, G24, G31, G32, G39, G40, G47, G48, G55, G56, G63, G64
Cable Assembly
Connects to:
848152997
KS20472 round cell thermistor
848152989
ring or paddle type thermistors
848153003
210E Thermal Probe Multiplexer
Signal Name
Pin No.
ABS
93
ABS
94
DG
95
DG
96
Table 9
-
D: TR leads and Associated Rectifiers
Table 9
-
E: ABS Pin Numbers
Содержание GPS4827
Страница 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 20: ...Page 20 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 24: ...Page 24 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 34: ...Page 34 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 61: ...Page 61 Copyright 2021 ABB All rights reserved Controller Display Menu Maps Configuration Menu Map ...
Страница 62: ...Page 62 Copyright 2021 ABB All rights reserved Control and Operations Menu Map ...
Страница 63: ...Page 63 Copyright 2021 ABB All rights reserved Status Menu Map ...
Страница 64: ...Page 64 Copyright 2021 ABB All rights reserved History Menu Map Statistics Menu Map ...
Страница 80: ...Page 80 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 82: ...Page 82 Copyright 2021 ABB All rights reserved This page intentionally left blank ...
Страница 90: ...Page 90 Copyright 2021 ABB All rights reserved This page intentionally left blank ...