44
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
2.
Install the winding cables to the fixed bottom
contact.
CAUTION!
Make sure that there is no tension in
the winding cables. Tension in the
winding cables will cause damage to
the cables.
G007610
3.
Install the washers and nuts. Tighten the nuts in a
crosswise sequence.
G006964
Torque
Please refer to the transformer
documentation.
4.
Remove the bolts (6), the washers (7) and the
lifting tool (1).
G006956
End of instruction