22
Installation and commissioning guide
1ZSC000563-AAF EN, REV. 4, 2021-06-23
5.
Install the tie bolts (86).
G006986
6.
Place the lifting tool, top part (1) on the top and
tighten the nuts.
G007153
End of instruction
4.3.2 Lifting the bushing for installation on the transformer
Procedure
1.
Make sure that the crane can lift the bushing. Refer to the net weight in the packing list.
2.
Align the second crane hook with the lifting tool, top part on the bushing.
3.
Attach soft lifting slings (8) from the lifting holes,
through the lifting tool, top part to the second
crane hook.
NOTE!
The first crane is still attached to the
flange lifting tool (88).
G006957
Содержание GOE 2600
Страница 12: ...12 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 18: ...18 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 78: ...78 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...
Страница 82: ...82 Installation and commissioning guide 1ZSC000563 AAF EN REV 4 2021 06 23 ...