background image


Figure 12: Spring Removed Up and Out of Assembly. 


Figure 13:

 

Shunt Trip Screw to be Unscrewed 

Figure 14: 2 Setscrews  

Shunt Trip Screw

¼-in Setscrews

4

12.

13.

14.

15.

17.

18.

19.

20.

assembly to the 

handle  side  of  the  assembly  wall  (Figure  

10).  If  Electric  Operator  is  installed, then  only  the  front 
and  handle side bolts  will  need  to  be  removed  because  
the  rear  bolt  will  not be installed.

Loosen  any  screws  on  the  front  face  of  the 
accessories(Figure 13) until the screws are fully loosened 
from  the    housing,  and  then  loosen  the  ¼-in  setscrews 
located on the side of the shunt trip guide housing (Figure 
14). This will allow the guide housing and accessories to be 
removed.
Using the supplied 

5

/

32

 Allen Wrench [6], unscrew the long 

bolt  (BH  HEX  SKT 

1

/

4

-20  X  3.56  SCREW)  located  on  the 

structure as seen in Figure 15 from the stop block but it is 
not necessary to fully remove from the Spacer Side Frame 
Pin tubing with collar that it passes through.
Wedge a flat head screwdriver between the spring frame 
bearing and shaft and then rotate 90 degrees in order to 
deflect the left side of the spring assembly wall outward 
(Figure  16)  to  allow  for  the  removal  of  the  stop  block

 

(Figure 17).
Discard the currently installed stop block, replace with  the 
new  stop  block  assembly  [3],  and  secure  with  the  three 
new  Bolts  with  nylon  patch  [4]  with  Steel  Spring  Lock 
Washers [5] on  each  to  65  inch-pounds min.  For  models 
with  the  Electric  Operator  only  replace  the  front  and 
handle side bolts.  Ensure that the holes in the new stop 
block align with the screw holes in the assembly to avoid 
installing the  new  stop  block  incorrectly. Looking  at  the 
block  with  the  stop  block  gasket  facing  down,  there 
should be three holes on the left side of the stop block and 
two holes on the right side.
Screw  in  the  long  bolt  as  seen  in  Figure  15  with  a 

5

/

32

 

Allen Wrench [6] to  90  inch-pounds min., and  secure the 
Shunt Trip guide casing and unit back into place.
Align  the  charging  spring  back  in  position, as  shown  in 
Figure 8.
Operate the  breaker charging handle  five times. Remove 
the spring assembly screw[1] and spacer[2] from the end 
of the spring.
Press  on  the  close  de-latch  lever  with  a  screwdriver, 
rotating it clockwise as seen from the handle side of the 
breaker,  as  shown  in  Figure  19.  Then,  with  another 
screwdriver,  rotate  the  close  de-latch  mechanism  to 
release the charging pawl.
Rotate the trip de-latch lever fully back against the frame, 
as shown in Figure 20, while pressing down on the cradle 
to release the closing mechanism. While holding the cradle 
down, rotate the spring forward against the stop block.

16.

Содержание GE Power Break II

Страница 1: ...ncteur à OFF le débrancher de toutes les sources de tension et déclencher les ressorts de fermeture avant d entamer cette procédure 1 Turn the breaker off and discharge the closing spring by depressing the OFF and ON buttons in the sequence OFF ON OFF Verify that the breaker OFF ON indicator shows OFF on a green background and that the charge indicator shows DISCHARGED on a white background 2 A dr...

Страница 2: ...rewdriver while operating the charging handle one time c Remove the screwdriver and operate the handle four more times Install the spring assembly screw 1 with spacer 2 at the end of the spring assembly as shown in Figure 5 with the supplied 5 32 Allen Wrench tool 6 Release the closing spring by pressing the close de latch lever with a screwdriver as shown in Figure 6 Then press the lever nearest ...

Страница 3: ... and external tooth lock washers from the left side of the Electric Operator Figure 22 Figure 23 with a 3 Phillips screwdriver If working on the stationary model support the Electric Operator with your hand so it does not fall following the next step Remove the two smaller hex screws and split lock washers from the silver bottom plate that secures the Electric Operator to the assembly walls Figure...

Страница 4: ...ntlyinstalled stop block replace with the new stop block assembly 3 and secure with the three new Bolts with nylon patch 4 with Steel Spring Lock Washers 5 on each to 65 inch pounds min For models with the Electric Operator only replace the front and handle side bolts Ensure that the holes in the new stop block align with the screw holes in the assembly to avoid installing the new stop block incor...

Страница 5: ...tom of the spring assembly Figure 23 Operate the charging handle one more time to fully charge the spring then close and trip the breaker Operate the charging handle once and hold the handle extended while reinstalling the breaker top cover as shown in Figure 2 Tighten the four 10 32 screws to 15 in lb Replace the trim plate if present and tighten the four 8 32 mounting screws to 20 in lb Operate ...

Страница 6: ...charging pawl Figure 20 Reinstalling the closing spring Figure 21 Draw out Breaker with Electric Operator Figure 22 Electric Operator Slid Left on Draw out Breaker after long Phillips screws unscrewed Left Side View Front View Electric Operator slid left 7 16 Bolt 6 ...

Страница 7: ...reserve the right to make technical changes or modify the contents of this document without prior notice With regard to purchase orders the agreed particulars shall prevail ABB Inc does not accept any responsibility whatsoever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained therein An...