24
Electrical commissioning
Checking the settings of the auxiliary voltage transformer
(G415)
The connections of the auxiliary voltage transformer (T10) are made at the factory. Make
sure that the voltage matches the desired voltage level at the site.
1-phase power output (option
+G410)
The inverter has a 1-phase power output
available at terminal 0X13 and the service outlet.
•
Voltage selection: 100, 115 or 230 V AC
•
Maximum power: 2 kVA
3-phase power output (option
+G429 or +G430)
The inverter has a 3-phase power output for an
auxiliary power transformer when option G429 or
G430 is selected.
•
Voltage: Same as inverter output
•
Power range: 6...50 kVA
•
Supplied fuse 32 A/30 A or 63 A/60 A
(IEC/UL)
•
Can be connected only to IT (ungrounded) systems
1
-X10
-X10
-T10
N
L
2
600V
0V
630V
660V
690V
115V
100V
230V
0V
3
4
5
6
7
8
9
10
11
PE
-PE
-0X13
PE
L
N
E
-0X12
PE
L1
L2
L3
Содержание Fimer PVS980-58-1818kVA-I
Страница 1: ...Central inverter PVS980 58 From 1818 to 2091 kVA Commissioning and maintenance manual ...
Страница 4: ...2 ...
Страница 14: ...12 Safety instructions ...
Страница 18: ...16 Introduction to the manual ...
Страница 28: ...26 Electrical commissioning ...
Страница 60: ...58 Maintenance ...
Страница 61: ...Further information For more information on FIMER products and services for solar applications visit fimer com ...