![ABB Emax Link 2 UR 1558 Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/abb/emax-link-2-ur-1558/emax-link-2-ur-1558_application-manual_4032024.webp)
24
E M A X LI N K 2 A B B R E V I ATE D
LV S W I TC H G E A R A P P L I C AT I O N G U I D E
Torque fasteners
Heat generated by improper terminal torque is a
leading cause of equipment failure. Torque
terminals to the values shown in the table.
Once torqued to the proper value, draw an “X”
across the fastener head and the surrounding
metal surface so you can visually check whether
the fastener has changed position and may require
attention. Bolts torqued at the factory will be
marked in the same way.
The torque tables apply to horizontal component
screw connections, vertical bus bar screw
connections, electrical terminal connections and
structural components of the Emax Link 2
Abbreviated LV Switchgear.
Note: For equipment connections and mountings,
see the manufacturers’ technical data sheets.
—
Installation guidelines
Emax Link 2 LV switchgear torque table
Union
Description
Screw
English
(ft/lbs)
Splice kit connections
Breaker connections
Run-ins / run-backs
to E1.2 breaker
3/8-16
33
Run-ins / run-backs
to E2.2 breaker
3/8-16
33
Run-ins / run-backs
to E4.2 breaker
1/2-13
78
Run-ins / run-backs
to E6.2 breaker
1/2-13
78
Bus bar ground connections
Run-ins to vertical riser
1/2-13
78
"L" connection to
vertical riser
1/2-13
78
"L" connection to
horizontal bus
1/2-13
78
Ground bracket to frame
3/8-16
33
Insulating barrier and support connections
Run-backs to cable
compartment barrier
3/8-16
33
Run-backs to lug pads
1/2-13
78
GPO3 cable compartment
barrier to frame
1/4-20
10
GPO3 to riser
support bracing
3/8-16
33
Exterior metal panels and enclosures
Frame assembly
1/4-20
10
Top plate to frame
1/4-20
10
Bottom plate to frame
1/4-20
10
Compartment to frame
1/4-20
10
Front door to frame
1/4-20
10
Rear door / panels to frame 1/4-20
10
Torque table
Torque fasteners as specified below when