Step
Action
Fan Shelves Connect Power
8
Connect Input Power and Frame Ground
Notes:
1.
Each feed supplies half of the shelf. A&B feeds for side 1 and A&B feeds for side 2.
2.
Power feeds should be derived from a fuse or breaker panel using discrete cabling which is independent
from the converter shelf.
3.
Fuse externally at 10 Amps.
4.
Use ring lugs or alternate per local practice.
5.
Returns for the A and B feeds are shared on the
-
48V
dc
RTN.
6.
The right position on the terminal block is the frame ground for the Fan Shelf.
7.
Connect de
-
energized DC cabling (typically 16 AWG) as shown here.
8.
Connect Frame Ground wire.
Figure 10 Fan Shelf Input Power Connections
Repeat from Step 8 for remaining Fan Shelves.
Frame Ground
-
48V RTN
B Feed (
-
48V)
A Feed (
-
48V)
Screws
24
-
16 gauge
Содержание CPS2400U
Страница 2: ...Page 2 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 8: ...Page 8 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 12: ...Page 12 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 30: ...Page 30 Copyright 2021 ABB All rights reserved This page intentionally left blank Jl ll ll ...
Страница 49: ...Page 49 Copyright 2021 ABB All rights reserved Figure 33 Converter Slot Fillers ...