Section-6
04-3008_S6_ABB_OPMCPDPA-S2_GB_121202
Page 6/6 ABB
Printed in Switzerland – Modifications reserved
6.1.3
Commissioning of Multi-Cabinet Configuration
WARNING!
THE OPERATIONS DESCRIBED IN THIS CHAPTER MUST BE
PERFORMED BY A SERVICE ENGINEER FROM THE MANUFACTURER
OR FROM A AGENT AUTHORIZED BY THE MANUFACTURER.
6.1.3.1
Start-up of a Multi-Cabinet Configuration
Before starting up a Multi-Cabinet Configuration verify that:
1.
All the input and output cabling has been performed correctly according to section 2 of this User
Manual;
2.
The parallel communication cables have been connected correctly according to Paragraph 1.2.2
3.
All the DIP Switches for the Modules and CONCEPTPOWER DPA
TM
- Cabinets been set correctly
according to Paragraph 1.2.3
4.
All the internal (if any) and /or external battery cabinets/racks have been connected correctly
The start-up of a Multi-Cabinet Configuration may be performed in analogy to the start-up procedures for a
single CONCEPTPOWER DPA
TM
- Cabinet described in Paragraph 1.1 of section 5.
6.1.3.2
Shutdown of Multi-Cabinet Configuration
Before shutting-down of a Multi-Cabinet Configuration make sure that the loads do need power protection and
that they are disconnected.
The UPS may be shut down completely if the loads do not need any power supply. Therefore the
steps in this Paragraph are to be performed only after the load has been disconnected and does
not need any power supply.
To perform a complete shutdown of a Multi-Cabinet Configuration proceed in analogy to the shutdown
procedures described in Paragraph 1.2 of section 5.
6.1.3.3
Replacement of a Faulty UPS-Module in a Multi-Cabinet Configuration
If in a Multi-Cabinet Configuration a UPS-Module fails proceed in replacing the UPS-Module in analogy with the
replacement procedures described in section 5 of this User Manual
!