![ABB Busch-Watchdog 220 WaveLINE Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/abb/busch-watchdog-220-waveline/busch-watchdog-220-waveline_operating-instructions-manual_5132010.webp)
Operating Instructions
Busch-Wächter
®
Installation and electrical
connection
Operating Instructions | 1473-1-8136
— 10 —
6.2.2
Preparing the installation
To prepare the installation of the device, perform the following steps:
Fig. 4:
Preparing the installation
No. Function
1 Locking
screw
2 … 5
Clamps
1. Remove the locking screw (1) (if installed).
2. Press in clamps 2 - 5 on the sides of the housing with a suitable tool.
3. Carefully remove the front of the device.
Fig. 5:
Opening the water drain
Depending on where the device is installed, the water drain may have to be opened.
•
To do this, pierce the plastic membrane on the bottom of the device.
The installation is prepared.
1
2
3
4
5