Manual for High Voltage Process Performance Motors
Commissioning Report - 82
3BFP 000 063 R0101 REV D
3 Mechanical Installation
Foundation is checked according to machine
drawing:
Possible foundation anchor bolts or sole
plates are mounted according to instructions:
Air gap is measured, if applicable:
For pedestal bearings, mark values 1-4, and
for flanged bearings, values A-D
1 ____________ A ____________
2 ____________ B ____________
3 ____________ C ____________
4 ____________ D ____________
For alignment of the coupling, use either
values 1-4 or values A-D
1 ____________
2 ____________
3 ____________
4 ____________
A ____________
B ____________
C ____________
D ____________
Axial position of the rotor: ET #1:__________mm, ET #2:__________mm
Axial distance between shaft ends: __________mm
Rotor support distance:
Crankshaft deflection is checked:
Tapered guide pins are used to lock the
position of the machine after alignment:
Foundations bolts are tightened with torque
wrench:
Bolt lubrication:
Cooling water:
Cooling element piping:
Transport locking device is removed:
Rotor rotates without noise or scraping:
no
yes, bolt size:_____________torque:_______________Nm
no
yes, drawing number:_____________________________
no
yes
no
yes
no
yes
dry
no
yes
top
Radial alignment of coupling
D-end
top
top
Angular alignment of coupling
N-end
top
Exciter N-end
top
no
yes
______mm ______mm
flexible
rigid
yes, amount:
no
m
3
/s
oil,
MoS
2
1
2
3
4
A
B
C
D
1
A
2
B
3
C
4
D
1
2
3
4
A
B
C
D
1
2
3
4
A
B
C
D
1
2
3
4
A
B
C
D