10 Quick start-up guide
Decanter drive start-up
The checklist for Decanter drive start-up is given below:
Step
Action
1
Connect digital and analog I/Os according to the wiring diagram shown in section
Decanter I/O control connections
2
Perform basic start-up of the drive. See
ACS880 primary control program firmware
manual (3AUA0000085967[English])
.
3
Activate Decanter control program with parameter
4
Activate default relay outputs and default actual values on the control panel with
parameters 10.24...10.32. See
ACS880 primary control program firmware manual
(3AUA0000085967[English]).
5
Activate Bowl drive with following parameters:
•
•
•
6
Activate Scroll drive with following parameters:
•
•
Decanter control selection in scroll
•
•
•
•
•
•
•
•
7
Activate torque windows with following parameters:
•
•
•
•
8
Activate load compensation with following parameters:
•
•
•
9
The drive is ready to run.
Perform a test run with the motors de-coupled in the driven machinery.
Содержание ACS880 Series
Страница 1: ...ABB industrial drives Supplement ACS880 Centrifuge Decanter control program N5150...
Страница 4: ......
Страница 10: ...6 Introduction...
Страница 46: ...42 Signals and parameters...
Страница 50: ...www abb com drives www abb com drivespartners 3AXD50000016078 Rev B EN 2017 08 08 Contact us...