Go through these steps before you begin any installation or maintenance work.
1. Clearly identify the work location and equipment.
2. Disconnect all possible voltage sources. Make sure that re-connection is not possible.
Lock out and tag out.
• Open the main disconnecting device of the drive.
• If you have a permanent magnet motor connected to the drive, disconnect the
motor from the drive with a safety switch or by other means.
• Disconnect all dangerous external voltages from the control circuits.
• After you disconnect power from the drive, always wait 5 minutes to let the
intermediate circuit capacitors discharge before you continue.
3. Protect any other energized parts in the work location against contact.
4. Take special precautions when close to bare conductors.
5. Measure that the installation is de-energized. Use a quality voltage tester.
• Before and after measuring the installation, verify the operation of the voltage
tester on a known voltage source.
• Make sure that the voltage between the drive input power terminals (L1, L2, L3)
and the grounding (PE) busbar is zero.
• Make sure that the voltage between the drive output terminals (T1/U, T2/V,
T3/W) and the grounding (PE) busbar is zero.
• Make sure that the voltage between the drive DC terminals (UDC+ and UDC-)
and the grounding (PE) terminal is zero.
Note:
If cables are not connected to the drive DC terminals, measuring the
voltage from the DC terminal screws can give incorrect results.
6. Install temporary grounding as required by the local regulations.
7. Ask for a permit to work from the person in control of the electrical installation work.
■
Additional instructions and notes
WARNING!
Obey these instructions. If you ignore them, injury or death, or damage to the
equipment can occur.
If you are not a qualified electrical professional, do not do installation or
maintenance work.
16 Safety instructions
3
Содержание ACS880-11
Страница 1: ... ABB INDUSTRIAL DRIVES ACS880 11 drives Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 26: ...26 ...
Страница 52: ...52 ...
Страница 82: ...82 ...
Страница 95: ...R6 R8 IP21 R6 R8 IP55 Electrical installation IEC 95 ...
Страница 103: ...R6 1 5 N m 0 5 N m Electrical installation IEC 103 ...
Страница 104: ...R8 1 5 N m 0 5 0 6 N m 104 Electrical installation IEC ...
Страница 112: ...With FDPI 02 modules OPEN TERMIN ATED 1 1 2 2 OPEN TERMINATED 3 112 Electrical installation IEC ...
Страница 116: ...R6 R8 UL Type 1 R6 R8 UL Type 12 116 Electrical installation North America NEC ...
Страница 120: ...R3 7 7 8 8 L1 L2 L3 T1 U T2 V T3 W PE Ground 1 7 N m 1 2 lbf ft 120 Electrical installation North America NEC ...
Страница 142: ...142 ...
Страница 154: ... Fan arrow must point up 154 Maintenance ...
Страница 160: ...160 ...
Страница 181: ... Package dimensions R6 R3 R8 Technical data 181 ...
Страница 202: ...R3 IP21 UL Type 1 3AXD50000045323 202 Dimension drawings ...
Страница 203: ...R3 Option B056 IP55 UL Type 12 3AXD50000045322 Dimension drawings 203 ...
Страница 204: ...R6 IP21 UL Type 1 3AXD50000045353 204 Dimension drawings ...
Страница 205: ...R6 Option B056 IP55 UL Type 12 3AXD50000045352 Dimension drawings 205 ...
Страница 206: ...R8 IP21 UL Type 1 3AXD50000047667 206 Dimension drawings ...
Страница 207: ...R8 Option B056 IP55 UL Type 12 3AXD50000047667 Dimension drawings 207 ...
Страница 208: ...208 ...
Страница 225: ... Declarations of conformity The Safe torque off function 225 ...