Required tools
To install the drive mechanically, you need the following tools:
•
drill with suitable bits
•
screwdriver set (Torx, flat and/or Phillips, as appropriate)
•
socket set (metric)
•
tape measure, if you will not be using the provided mounting template.
Moving the drive
Move the drive in its transport package to the installation site. Use a pallet truck when
you move a heavy drive package.
Unpacking and examining the delivery
■
Transport package contents
The flange mounting kit package is tied with straps onto the drive package (frame R3),
packed under the cardboard cover (frames R6 and R8), or sent separately. Make sure
that all items are present and there are no signs of damage. Read the data on the type
designation label of the drive to make sure that the drive is of the correct type.
Mechanical installation 19
Содержание ACS880-11
Страница 1: ...ABB DRIVES ACS880 11 ACS880 31 ACH580 31 and ACQ580 31 C135 drives with flange mounting kit Supplement...
Страница 2: ......
Страница 4: ......
Страница 9: ...ACQ580 31 manuals ACH580 31 manuals Introduction to the supplement 9...
Страница 10: ...10...
Страница 15: ...Front view of ACH580 31 frame R6 is shown below 3 8 2SHQ 7 SH 3 8 7 SH 3 8 7 SH Hardware description 15...
Страница 43: ...Attaching points and opening dimensions frame R3 Dimension drawings 43...
Страница 46: ...Attaching points and opening dimensions frame R6 46 Dimension drawings...
Страница 49: ...Attaching points and opening dimensions frame R8 Dimension drawings 49...
Страница 50: ...50...