Installation checklist 105
9
Installation checklist
Contents of this chapter
This chapter contains an installation checklist which you must complete before you start up
the drive.
Warnings
WARNING!
Obey the instructions in chapter
. If you ignore
them, injury or death, or damage to the equipment can occur.
Checklist
Precautions before electrical work
before you start the
work. Go through the checklist together with another person..
Check that …
The ambient operating conditions meet the specifications given in chapter
The power supply voltage matches the nominal input voltage of the drive. Refer to the type
designation lable.
Measure the input power cable, motor cable and the insulation resistor of the motor according to the
local procedure and the drive manual.
The drive cabinet has been fixed to floor, and if necessary due to vibration etc, also from top to the
wall or roof.
The cooling air will flow freely in and out of the drive cabinet,
Содержание ACS880-07C
Страница 1: ... ABB INDUSTRIAL DRIVES Hardware manual ACS880 07C drives 45 to 710 kW 50 to 700 hp ...
Страница 4: ......
Страница 12: ...12 ...
Страница 28: ...28 Operation principle and hardware description General information on the cabinet layout IP22 IP42 ...
Страница 74: ...74 Electrical installation PE PE 8 PE 13 11 7 8 12 13 ...
Страница 88: ...88 Electrical installation ...
Страница 98: ...98 Control unit of frames R6 to R9 ...
Страница 110: ...110 Fault tracing ...
Страница 121: ...Maintenance 121 9 After replacing with a new fan install and reset according to the reverse order 5 3 6 3 4 8 7 7 ...
Страница 124: ...124 Maintenance 5 Remove the copper bar 6 Undo the four upper and lower nuts of the drive module ...
Страница 125: ...Maintenance 125 7 Install the sliding rail ...
Страница 132: ...132 Maintenance 9 Fasten the extraction ramp to the cabinet base with two screws 9b 9a ...
Страница 136: ...136 Maintenance ...
Страница 148: ...148 Technical data R6 Input and output cable terminal size incoming switch OT160 ...
Страница 149: ...Technical data 149 R7 Input and output cable terminal size incoming switch OT160 OT250 ...
Страница 150: ...150 Technical data R8 Input and output cable terminal size incoming switch OT160 OT250 ...
Страница 151: ...Technical data 151 R7 Input and output cable terminal size incoming switch OT315 ...
Страница 152: ...152 Technical data R8 Input and output cable terminal size incoming switch OT315 ...
Страница 153: ...Technical data 153 R9 Input and output cable terminal size incoming switch OT315 OT400 ...
Страница 154: ...154 Technical data R9 Input and output cable terminal size incoming switch OT630 ...
Страница 155: ...Technical data 155 R6 R7 R8 Input cable terminal size incoming switch OT160 OT250 option F250 ...
Страница 156: ...156 Technical data R7 R8 Input cable terminal size incoming switch OT315 option F250 ...
Страница 157: ...Technical data 157 R9 Input cable terminal size incoming switch OT315 OT400 option F250 ...
Страница 158: ...158 Technical data R9 Input cable terminal size incoming switch OT630 option F250 ...
Страница 159: ...Technical data 159 R6 R7 R8 Output cable terminal size DU DT filter option E205 ...
Страница 160: ...160 Technical data R9 Output cable terminal size DU DT filter option E205 ...
Страница 161: ...Technical data 161 R10 Input and output cable terminal size ...
Страница 162: ...162 Technical data ...
Страница 163: ...Technical data 163 ...
Страница 164: ...164 Technical data R11 Input and output cable terminal size ...
Страница 165: ...Technical data 165 ...
Страница 166: ...166 Technical data ...
Страница 172: ...172 Technical data ...
Страница 174: ...174 Dimension drawings Frame sizes R6 to R8 ...
Страница 175: ...Dimension drawings 175 Frame size R9 ...
Страница 176: ...176 Dimension drawings Frame size R10 ...
Страница 177: ...Dimension drawings 177 Frame size R11 ...
Страница 178: ...178 Dimension drawings ...
Страница 180: ...180 Safe torque off function ...