Connecting the control cables
Routing the cables (frame sizes R5 and R6)
Run the cables to the inside of the cabinet through the grommets (1) and the EMI
conductive cushions (2) to the swing-out frame or the RMIO board as shown below.
Use sleeving wherever the cables are laid against sharp edges. Leave some slack in
the cable at the hinge (3) to allow the frame to open fully. Tie the cables to the
braces (4) to provide strain relief.
1
2
3
4
4
3
4 Strain relief at the left
side of the cabinet
RMIO
Содержание ACS800-U7
Страница 1: ...ACS800 Hardware Manual ACS800 07 Drives 45 to 560 kW ACS800 U7 Drives 50 to 600 hp ...
Страница 4: ......
Страница 28: ...Operation principle and hardware description 28 ...
Страница 51: ...Planning the electrical installation 51 ...
Страница 60: ...Planning the electrical installation 60 ...
Страница 76: ...Electrical installation 76 ...
Страница 84: ...Motor control and I O board RMIO 84 ...
Страница 112: ...Maintenance 112 ...
Страница 138: ...Dimensional drawings 138 Frame sizes R5 and R6 64778340_1 5 K ...
Страница 139: ...Dimensional drawings 139 Frame sizes R7 and R8 68749930_1 7 C ...
Страница 140: ...Dimensional drawings 140 IP54 and IP54R units of frame sizes R7 and R8 68749930_6 6 C ...
Страница 148: ...3AFE64702165 Rev H EN 2012 09 19 Contact us www abb com drives www abb com drivespartners ...